EasyScreed – Dry screed boards

Perfect for dry flooring – with high durability, deeply impregnated with tongue-and-groove connection. A2 certified.

Flooring made easy with easyscreed:

R

Save time

quick and easy installation, after the adhesive has hardened, it is immediately ready for covering
R

Dry Flooring

no additional moisture
R

easy installation

no special knowledge or tools required
R

highly combinable

can be combined with various fillings, insulating materials, underfloor heating elements, ceiling systems (old and new buildings)
R

Renovation of old buildings

sound improvement, fire protection with moderate load transfer, lowest possible installation height, etc.

Tel.: +49 381 877 45 811

Planning a project? We'd be happy to help you.

EasyScreed – dry screed boards

EasyScreed by Bausal is a screed made from CETRIS cement-bonded particle boards, ideal for dry flooring with heavy use, deeply impregnated with positive-locking tongue and groove connection.

The boards are designed for flat surfaces (ceiling construction, false floor). The installation is done floating. Enjoy fast and easy flooring as well as simple and seamless assembly.

The dry screed panels have a dimension of 20 x 625 x 1250 mm (including the spring). Other dimensions and thicknesses are available upon request.

Instructions

Requirements

 
To begin with, the surfacemust be well leveled and non-resilient. Compensate for any unevenness beforehand by filling or pouring. If there is moisture, insert a vapor barrier under the insulation. In the case of concrete ceilings, insert a 0.2 mm thick PE film with a 25 cm overlap. Pull up the film on the walls. A special moisture seal must be made in accordance with DIN 18195. Store the panels at the installation site 2 days before starting the work. Required relative air humidity on average <60%. In the case of existing wooden planks, these are to be screwed onto the plank substructure in order to prevent the planks from springing. If fillings are required, a trickle protection made from wax paper should be used. Do not insert PE film. Level the fill exactly to achieve an optimal laying result. Follow the instructions of the insulation material manufacturer. If pipes are to be laid in the fill, they must be completely insulated. For electrical cables, a max. Do not exceed a width of 10 cm. Pipes and cables must have at least 10 mm coverage to prevent sound bridges.[/et_pb_text][et_pb_divider color="#ededed" _builder_version="3.29.3"][/et_pb_divider][/et_pb_column][/et_pb_row][et_pb_row column_structure="1_3,1_3,1_3" _builder_version="3.29.3" custom_margin="||0px||false|false" custom_padding="||0px||false|false"][et_pb_column type="1_3" _builder_version="3.29.3"][et_pb_text _builder_version="4.4.8"]

Tools

  • Pulling iron
  • Hammer (up to 1.5kg)
  • Circular saw
  • Jigsaw
  • Wedges (preferably wood)
  • Wooden tapping block

Materials

  • EasyScreed boards
  • Edge insulation strips
  • PU adhesive

if necessary:

  • Filler
  • insulation
  • Fill
  • Trickle protection, wax paper

Adjustments

Use a jigsaw for cutouts, curves and adjustments to built-in parts, and a circular saw with a guide rail for straight cuts. Use saw blades suitable for stone to ensure the required tool life and cutting quality.

Instructions

Prepare

Apply edge insulation strips to the edges of the installation surface, fix them with wooden wedges if necessary. Maintain a gap of at least 10 mm. Other components such as heating and water pipes are also provided with such an insulation strip.

Glue

Use the supplied PU adhesive for gluing, approx. 40 g per m². The connection joints of the dry screed elements must be undamaged, dry, free of dust and grease. Apply the adhesive to the tongue and groove of the plate.

Joint

Lay the first row of panels along a wall. Add the following row of plates in an offset. Avoid cross joints! Insert the plates at a slight pressure into the elements that have already been laid. Close longitudinal joints well. Compact the transverse joints with a hammer and firewood. Avoid hitting the panels directly.

Finish the edges

Insert the edge plates at an angle and then close the joints with the help of a pulling or assembly iron. After the laying work has been completed, remove the wooden wedges from the edge insulation strips. Seal the expansion joint with color-matching silicone. Attach skirting boards.

Sample recommendation

Lay the panels from left to right. When laying on a bed, work into the room from the door so as not to injure the bed. Secure panels along the walls with wooden wedges. Maintain a gap of at least 10 mm. Place the remaining panels of the previous row in the next row as the first element (sketch). The minimum size is 300mm. Other laying patterns possible, e.g. Longitudinal arrangement in corridors and narrow rooms.

Planning a project? Get free consultation

Please check:

Bausal GmbH | PF 141026 | 18024 Rostock | Germany

+49 (0)381 877 45 811 (Headquarters)

+49 (0)381 877 45 812 (Accounting)

+49 (0)381 877 45 814 (FAX)

info@bausal.de